Alliance Leisure - Design & Build part 10

The design and build stages of a project can be, potentially, the most bumpy. Alliance Leisure business development managers James Foley and Julia Goddard share how they helped smooth the way for clients in Doncaster and Cwmbran


How is the process managed?
From the start, Alliance works to develop the scheme concepts affordably and innovatively with the client and our property consultants Savernake Property, and other contractors. This is very different to other approaches where design and build outcomes can’t be delivered because only one contractor was involved at the start.

How does the design and build process begin?
Alliance has a unique approach and works with clients from the start and at every step until the project is delivered successfully. As Business Development Manager this involves establishing the project is viable before thinking about how that concept might look. We’ll look to increase participation by adapting, reinvigorating or in cases such as Adwick Leisure Centre in Doncaster, totally transforming an underutilised space to create something different but relevant to users.

What was the brief a Adwick? Doncaster Culture and Leisure Trust (DCLT) wanted to explore options for increasing fitness provision at the site and improving the overall centre offering – looking at the facility catchment and competition – such as the introduction of new academy sports hall facilities. Our design team created a journey through the site with three distinct areas which all feel like they belong. Where the sports hall used to be, there is a new ‘family adventure’ area at ground level, with ten pin bowling, café, bar and play facilities. Upstairs there is a newly formed mezzanine ‘fitness’ area, with a space for large scale fitness fitted out by DCLT, along with studio provision and changing rooms, and the modernised reception leads through to the pool.

What about changes at the design and build stages?
Alliance works with the client to create a vision and design the project. As the build commences the vision on paper or a 3D model can look different to the real thing. We can adapt the design and change the build while ensuring that the total project cost is still maintained.

How are challenges along the way overcome?
No build project ever runs perfectly smoothly, but commissioning surveys and expertise at the start helps us avoid risks where possible. With issues that would normally fall outside of our remit, we work with the client to see how we could cost effectively integrate these into the project. For instance at Adwick Leisure Centre, putting in new ten pin bowling, 100 stations of gym equipment and new infrastructure will add power requirements to the site. Instead of paying for an expensive new supply, we gave Doncaster Leisure Trust the option to work creatively with our team to use energy saving techniques, avoiding unnecessary cost and keeping energy performance within existing limits.

What marks the end of the design and build process?
The end of the process for Alliance doesn’t stop when the build is complete. We then ensure a robust handover takes place and work with partners to train staff to operate elements, such as the bowling at Adwick. We work hard to resolve late snags, and are proud that our repeat project rate with clients is high – a testament to us having clients’ interests as our number one priority.

Follow the series
To view the whole series of articles on Alliance Leisure’s offering, visit: www.healthclubmanagement.co.uk/allianceleisure

1. Scoping/investigation
2. Conceptualisation
3. Viability assessment
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)
10. Design & Build

CASE STUDY

Cwmbran Stadium, Torfaen Leisure Trust

Alliance Leisure recently redesigned and converted Cwmbran Stadium’s four­-court sports hall into its newly branded ‘Go Vertical’ activity zone, including an 18 element VerTgo climbing area, large soft play and cafe. The main reception and atrium were also modernised and the old café was converted to a 75­-station fitness suite. The outdoor grass pitch is also being converted to a 3G surface. Sally Church, chief executive officer of Torfaen Leisure Trust (TLT) says: “The project was designed with us to suit our requirements. We wanted a project that would generate income and increase participation, and would also look very different, not municipal.”

Alliance Leisure worked with operators Torfaen Leisure Trust and the design team consisting of Createability for construction and Bicknell Shacklady Ewing for interior design. During designing, the design team had to solve the problem of a low ceiling in the former cafe area, which was to be converted into a fitness suite. “Instead of making major structural changes, we designed and created the suite around the ceiling height and planned the space accordingly,” says Julia Goddard, business development manager for Alliance Leisure. “It now has 75 stations with wide windows facing out on to the track, giving lots of natural light.”

Goddard adds: “During the build, issues with the location of the Go Vertical climbing briefing area were found, so rather than spend additional money to sort this out we took a week as a team to solve the problem and ended up locating the briefing area into the main activity space, which has worked really positively and saved costs of around £20,000.”

“Every issue or problem we have come across has been resolved,” adds Church. “The whole process has worked because we all took a ‘solutions not problems approach.’ Now we are working with Alliance on sales and marketing for both the gym and the Go Vertical climbing area.”

 



Cwmbran Stadium’s old sports hall has been converted into an 18-element VerTgo climbing centre
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 

Find out more:
www.allianceleisure.co.uk
Tel: +44 (0)1278 444944

The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
COMPANY PROFILES
TechnoAlpin Indoor

TechnoAlpin is the world leader for snowmaking systems. With the Indoor snow division, TechnoAlpin c [more...]
IDEATTACK

IDEATTACK is a full-service planning and design company with headquarters in Los Angeles. [more...]
RMA Ltd

RMA Ltd is a one-stop global company that can design, build and produce from a greenfield site upw [more...]
DJW

David & Lynn Willrich started the Company over thirty years ago, from the Audio Visual Department [more...]
+ More profiles  
FEATURED SUPPLIER

Iconic Liverpool attraction opens door to new operators
An opportunity to reimagine one of the UK’s most recognisable towers has been formally opened by Rivington Hark, as St Johns Beacon invites operators and partners to shape its next phase. [more...]
CATALOGUE GALLERY
 

+ More catalogues  
DIRECTORY
+ More directory  
DIARY

 

09-11 Jun 2026

World Sauna Forum 2026

Savutuvan Apaja, Haapaniemi, Finland
23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
+ More diary  
LATEST ISSUES
+ View Magazine Archive

Attractions Management

2026 issue 1


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2025 issue 2


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2025 issue 1


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2024 issue 4


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management News

06 Apr 2020 issue 153


View on turning pages
Download PDF
View archive
FREE digital subscription
Print subscription

Attractions Handbook

2019


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription
 
ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
 
ATTRACTIONS MANAGEMENT
ATTRACTIONS MANAGEMENT NEWS
ATTRACTIONS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026
Get Attractions Management digital magazine FREE
Sign up here ▸
Jobs    News   Products   Magazine   Subscribe
Promotional feature
Alliance Leisure - Design & Build part 10

The design and build stages of a project can be, potentially, the most bumpy. Alliance Leisure business development managers James Foley and Julia Goddard share how they helped smooth the way for clients in Doncaster and Cwmbran


How is the process managed?
From the start, Alliance works to develop the scheme concepts affordably and innovatively with the client and our property consultants Savernake Property, and other contractors. This is very different to other approaches where design and build outcomes can’t be delivered because only one contractor was involved at the start.

How does the design and build process begin?
Alliance has a unique approach and works with clients from the start and at every step until the project is delivered successfully. As Business Development Manager this involves establishing the project is viable before thinking about how that concept might look. We’ll look to increase participation by adapting, reinvigorating or in cases such as Adwick Leisure Centre in Doncaster, totally transforming an underutilised space to create something different but relevant to users.

What was the brief a Adwick? Doncaster Culture and Leisure Trust (DCLT) wanted to explore options for increasing fitness provision at the site and improving the overall centre offering – looking at the facility catchment and competition – such as the introduction of new academy sports hall facilities. Our design team created a journey through the site with three distinct areas which all feel like they belong. Where the sports hall used to be, there is a new ‘family adventure’ area at ground level, with ten pin bowling, café, bar and play facilities. Upstairs there is a newly formed mezzanine ‘fitness’ area, with a space for large scale fitness fitted out by DCLT, along with studio provision and changing rooms, and the modernised reception leads through to the pool.

What about changes at the design and build stages?
Alliance works with the client to create a vision and design the project. As the build commences the vision on paper or a 3D model can look different to the real thing. We can adapt the design and change the build while ensuring that the total project cost is still maintained.

How are challenges along the way overcome?
No build project ever runs perfectly smoothly, but commissioning surveys and expertise at the start helps us avoid risks where possible. With issues that would normally fall outside of our remit, we work with the client to see how we could cost effectively integrate these into the project. For instance at Adwick Leisure Centre, putting in new ten pin bowling, 100 stations of gym equipment and new infrastructure will add power requirements to the site. Instead of paying for an expensive new supply, we gave Doncaster Leisure Trust the option to work creatively with our team to use energy saving techniques, avoiding unnecessary cost and keeping energy performance within existing limits.

What marks the end of the design and build process?
The end of the process for Alliance doesn’t stop when the build is complete. We then ensure a robust handover takes place and work with partners to train staff to operate elements, such as the bowling at Adwick. We work hard to resolve late snags, and are proud that our repeat project rate with clients is high – a testament to us having clients’ interests as our number one priority.

Follow the series
To view the whole series of articles on Alliance Leisure’s offering, visit: www.healthclubmanagement.co.uk/allianceleisure

1. Scoping/investigation
2. Conceptualisation
3. Viability assessment
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)
10. Design & Build

CASE STUDY

Cwmbran Stadium, Torfaen Leisure Trust

Alliance Leisure recently redesigned and converted Cwmbran Stadium’s four­-court sports hall into its newly branded ‘Go Vertical’ activity zone, including an 18 element VerTgo climbing area, large soft play and cafe. The main reception and atrium were also modernised and the old café was converted to a 75­-station fitness suite. The outdoor grass pitch is also being converted to a 3G surface. Sally Church, chief executive officer of Torfaen Leisure Trust (TLT) says: “The project was designed with us to suit our requirements. We wanted a project that would generate income and increase participation, and would also look very different, not municipal.”

Alliance Leisure worked with operators Torfaen Leisure Trust and the design team consisting of Createability for construction and Bicknell Shacklady Ewing for interior design. During designing, the design team had to solve the problem of a low ceiling in the former cafe area, which was to be converted into a fitness suite. “Instead of making major structural changes, we designed and created the suite around the ceiling height and planned the space accordingly,” says Julia Goddard, business development manager for Alliance Leisure. “It now has 75 stations with wide windows facing out on to the track, giving lots of natural light.”

Goddard adds: “During the build, issues with the location of the Go Vertical climbing briefing area were found, so rather than spend additional money to sort this out we took a week as a team to solve the problem and ended up locating the briefing area into the main activity space, which has worked really positively and saved costs of around £20,000.”

“Every issue or problem we have come across has been resolved,” adds Church. “The whole process has worked because we all took a ‘solutions not problems approach.’ Now we are working with Alliance on sales and marketing for both the gym and the Go Vertical climbing area.”

 



Cwmbran Stadium’s old sports hall has been converted into an 18-element VerTgo climbing centre
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 
 


The stadium’s former cafe area has been converted into a 75-station fitness suite, and the new design lets light flood into the space
 

Find out more:
www.allianceleisure.co.uk
Tel: +44 (0)1278 444944

The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
The Alliance project at Adwick Leisure Centre in Doncaster included a new ten pin bowling area and a 100-station gym
LATEST NEWS
Butterfly sanctuary to host hot yoga during retreat at Jersey Zoo for Hotel de France
Hotel de France, located on the British Isle of Jersey, has created a wellness retreat package that includes a hot yoga session that will take place in Jersey Zoo’s butterfly sanctuary.
Warner Bros Discovery collaborates on upcoming Pompeii attraction
A new immersive attraction designed to transport visitors into the final hours of ancient Pompeii is preparing to open near the world-famous archaeological site in southern Italy.
Bob Rogers hands BRC to long-serving leadership team
Experience design company, BRC Imagination Arts, has completed a transition that sees founder Bob Rogers pass ownership of the business to four long-serving senior executives, while remaining actively involved with the company.
Rainer Maelzer joins Therme Group as chief entertainment officer
Rainer Maelzer, an experiential entertainment innovator, has been appointed chief entertainment officer by Therme Group.
Movie Park Germany reveals new Paramount attraction as part of its 30th anniversary celebrations
Movie Park Germany has opened a new Paramount Pictures-themed attraction as part of its 30th anniversary celebrations, using immersive storytelling and adaptive reuse to reinforce the park’s longstanding “Hollywood in Germany” positioning.
Therme Manchester reveals 90:90 strategy – 90 per cent of the UK population within a 90-minute drive of a Therme
Therme Manchester’s 28-acre development, which will include interconnected glass pavilions that measure 65,000sq m, will be the largest bathing and wellbeing attraction in the world once complete, according to prof David Russell, CEO of Therme UK. 
Efteling expands family offer with new Hooghmoed drop tower
Efteling has opened Hooghmoed, a new family drop tower designed to broaden the appeal of its recently launched Sirene Island themed area and introduce younger visitors to thrill attractions.
Universal and Puy du Fou projects point to rise of Oxford–Cambridge corridor
A proposed Puy du Fou development near Bicester and Universal Destinations and Experiences’ planned resort in Bedford are emerging as part of a wider transformation of the Oxford– Cambridge Growth Corridor into a major centre for UK leisure and tourism inv
Shedd Aquarium upgrades its visitor experience with new Immersion Theater
Shedd Aquarium has opened the Immersion Theater developed in partnership with SimEx- Iwerks, as part of a wider strategy to enhance the guest experience and create additional revenue opportunities.
UK government cuts VAT on attractions to boost summer visitor economy
The UK government has announced a temporary reduction in VAT on visitor attractions and children’s meals as part of a summer cost-of-living support package designed to stimulate the visitor economy and encourage family days out.
Joy as a radical act: Yinka Ilori launches solo exhibition celebrating the rebellious power of spreading happiness
As designer Yinka Ilori prepares for his first solo gallery show in London, he speaks exclusively to CLADmag about his mission to spread joy, the power of play, and his bold approach to using colour (including the colours you won’t see in his work).
Government of Thailand reveals it is courting major theme park operators
The government of Thailand is exploring plans for a THB300bn (£6.3bn, US$8.3bn) entertainment complex in the country’s Eastern Economic Corridor (EEC), with officials proposing a large-scale theme park and sports destination as part of a broader tourism and economic development strategy.
+ More news   
 
COMPANY PROFILES
TechnoAlpin Indoor

TechnoAlpin is the world leader for snowmaking systems. With the Indoor snow division, TechnoAlpin c [more...]
IDEATTACK

IDEATTACK is a full-service planning and design company with headquarters in Los Angeles. [more...]
RMA Ltd

RMA Ltd is a one-stop global company that can design, build and produce from a greenfield site upw [more...]
DJW

David & Lynn Willrich started the Company over thirty years ago, from the Audio Visual Department [more...]
+ More profiles  
FEATURED SUPPLIER

Iconic Liverpool attraction opens door to new operators
An opportunity to reimagine one of the UK’s most recognisable towers has been formally opened by Rivington Hark, as St Johns Beacon invites operators and partners to shape its next phase. [more...]
CATALOGUE GALLERY
+ More catalogues  
DIRECTORY
+ More directory  
DIARY

 

09-11 Jun 2026

World Sauna Forum 2026

Savutuvan Apaja, Haapaniemi, Finland
23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
+ More diary  
 


ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
ATTRACTIONS MANAGEMENT NEWS
ATTRACTIONS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS