Latest
issue
Get Attractions Management digital magazine FREE
Sign up here ▸
Jobs   News   Features   Products   Company profilesProfiles   Magazine   Handbook   Advertise    Subscribe  
NEWS
Hong Kong Museum of Art to undergo major HK$930m renovation
POSTED 08 Jul 2015 . BY Tom Anstey
The re-christened Hong Kong Art Gallery will gain nearly double the amount of exhibition space
The Hong Kong Museum of Art is to close in August for a four-year HK$930m (US$120m, €109m, £78m) renovation, which will nearly double the amount of exhibition space available to the 53-year-old institute.

Scheduled to reopen in 2019, the museum’s main exhibition area will be expanded to 10,000sq m (107,600sq ft), with an additional three galleries also being developed, increasing the total number to 10. Hong Kong's Architectural Services Department is acting as lead architect for the redevelopment.

The re-christened Hong Kong Art Gallery – originally designed by Verner Johnson – will also have its ceiling height raised from between 3.5-4.5m (11.4-14.7ft) to between 5-9m (16.4-29.5ft). A new rooftop gallery will also be installed, while a new annex will house a further two galleries. Finally, the existing restaurant and gift shop will be moved to the building’s ground floor.

“The upgrade was needed because the current museum was built 24 years ago and failed to cater to modern exhibition needs,” said Chan Shing-wai, assistant director of the Leisure and Cultural Services Department of the Hong Kong Government, which manages the facility and is behind the plans. "In fact, we have had a pressing need to do so for some time."

"If we are to show art pieces from overseas, we usually need two to three exhibition galleries,” added museum director Eve Tam. “There is a pressing need for us to have more galleries so large-scale exhibitions can take place here."

During the closure, the museum’s 16,000 artworks – which have been mainly curated from Hong Kong and mainland China – will go on display in various places throughout Hong Kong, including the Central Library in Causeway Bay and the Heritage Discovery Centre in Kowloon Park.

Credit: Hong Kong Architectural Services Department
Credit: Hong Kong Architectural Services Department
RELATED STORIES
  Opening of Herzog and de Meuron's US$645m M+ Museum pushed back to 2019


The opening of the hotly-anticipated M+ Museum in Hong Kong’s West Kowloon Cultural District (WKCD) has been pushed back to 2019 after a delay in funding held up the construction process.
  Frozen helps Hong Kong Disneyland break merchandise sales record


Hong Kong Disneyland is crediting the ever-popular Frozen IP for helping it to break its merchandise sales record over the past year.
  Ocean Park brings first koalas to Hong Kong in new Australian exhibit


Hong Kong’s Ocean Park has opened up its latest attraction – an outback themed park offering guests an authentic Australian experience and the sovereign state’s first koalas.
  Hong Kong government in talks to double the size of Disneyland


The Hong Kong government is planning to hold talks with Disney on further expanding Hong Kong Disneyland in a bid to boost tourism in the area and propel economic growth.
MORE NEWS
Butterfly sanctuary to host hot yoga during retreat at Jersey Zoo for Hotel de France
Hotel de France, located on the British Isle of Jersey, has created a wellness retreat package that includes a hot yoga session that will take place in Jersey Zoo’s butterfly sanctuary.
Warner Bros Discovery collaborates on upcoming Pompeii attraction
A new immersive attraction designed to transport visitors into the final hours of ancient Pompeii is preparing to open near the world-famous archaeological site in southern Italy.
Bob Rogers hands BRC to long-serving leadership team
Experience design company, BRC Imagination Arts, has completed a transition that sees founder Bob Rogers pass ownership of the business to four long-serving senior executives, while remaining actively involved with the company.
Rainer Maelzer joins Therme Group as chief entertainment officer
Rainer Maelzer, an experiential entertainment innovator, has been appointed chief entertainment officer by Therme Group.
+ More news   

COMPANY PROFILES
Painting With Light

By combining lighting, video, scenic and architectural elements, sound and special effects we tell s [more...]
Vekoma Rides Manufacturing B.V.

Vekoma Rides has a large variety of coasters and attractions. [more...]
IDEATTACK

IDEATTACK is a full-service planning and design company with headquarters in Los Angeles. [more...]
Sally Corporation

Our services include: Dark ride design & build; Redevelopment of existing attractions; High-quality [more...]
+ More profiles  
FEATURED SUPPLIER

Iconic Liverpool attraction opens door to new operators
An opportunity to reimagine one of the UK’s most recognisable towers has been formally opened by Rivington Hark, as St Johns Beacon invites operators and partners to shape its next phase. [more...]
CATALOGUE GALLERY
 

+ More catalogues  
DIRECTORY
+ More directory  
DIARY

 

23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
29 Sep - 02 Oct 2026

Synergy - The Retreat Show

Pical Resort, Valamar Collection, Porec, Croatia
+ More diary  
LATEST ISSUES
+ View Magazine Archive

Attractions Management

2026 issue 1


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2025 issue 2


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2025 issue 1


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2024 issue 4


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management News

06 Apr 2020 issue 153


View on turning pages
Download PDF
View archive
FREE digital subscription
Print subscription

Attractions Handbook

2019


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription
 
ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
 
ATTRACTIONS MANAGEMENT
ATTRACTIONS MANAGEMENT NEWS
ATTRACTIONS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026
Get Attractions Management digital magazine FREE
Sign up here ▸
Jobs    News   Products   Magazine   Subscribe
NEWS
Hong Kong Museum of Art to undergo major HK$930m renovation
POSTED 08 Jul 2015 . BY Tom Anstey
The re-christened Hong Kong Art Gallery will gain nearly double the amount of exhibition space
The Hong Kong Museum of Art is to close in August for a four-year HK$930m (US$120m, €109m, £78m) renovation, which will nearly double the amount of exhibition space available to the 53-year-old institute.

Scheduled to reopen in 2019, the museum’s main exhibition area will be expanded to 10,000sq m (107,600sq ft), with an additional three galleries also being developed, increasing the total number to 10. Hong Kong's Architectural Services Department is acting as lead architect for the redevelopment.

The re-christened Hong Kong Art Gallery – originally designed by Verner Johnson – will also have its ceiling height raised from between 3.5-4.5m (11.4-14.7ft) to between 5-9m (16.4-29.5ft). A new rooftop gallery will also be installed, while a new annex will house a further two galleries. Finally, the existing restaurant and gift shop will be moved to the building’s ground floor.

“The upgrade was needed because the current museum was built 24 years ago and failed to cater to modern exhibition needs,” said Chan Shing-wai, assistant director of the Leisure and Cultural Services Department of the Hong Kong Government, which manages the facility and is behind the plans. "In fact, we have had a pressing need to do so for some time."

"If we are to show art pieces from overseas, we usually need two to three exhibition galleries,” added museum director Eve Tam. “There is a pressing need for us to have more galleries so large-scale exhibitions can take place here."

During the closure, the museum’s 16,000 artworks – which have been mainly curated from Hong Kong and mainland China – will go on display in various places throughout Hong Kong, including the Central Library in Causeway Bay and the Heritage Discovery Centre in Kowloon Park.

Credit: Hong Kong Architectural Services Department
Credit: Hong Kong Architectural Services Department
RELATED STORIES
Opening of Herzog and de Meuron's US$645m M+ Museum pushed back to 2019


The opening of the hotly-anticipated M+ Museum in Hong Kong’s West Kowloon Cultural District (WKCD) has been pushed back to 2019 after a delay in funding held up the construction process.
Frozen helps Hong Kong Disneyland break merchandise sales record


Hong Kong Disneyland is crediting the ever-popular Frozen IP for helping it to break its merchandise sales record over the past year.
Ocean Park brings first koalas to Hong Kong in new Australian exhibit


Hong Kong’s Ocean Park has opened up its latest attraction – an outback themed park offering guests an authentic Australian experience and the sovereign state’s first koalas.
Hong Kong government in talks to double the size of Disneyland


The Hong Kong government is planning to hold talks with Disney on further expanding Hong Kong Disneyland in a bid to boost tourism in the area and propel economic growth.
MORE NEWS
Butterfly sanctuary to host hot yoga during retreat at Jersey Zoo for Hotel de France
Hotel de France, located on the British Isle of Jersey, has created a wellness retreat package that includes a hot yoga session that will take place in Jersey Zoo’s butterfly sanctuary.
Warner Bros Discovery collaborates on upcoming Pompeii attraction
A new immersive attraction designed to transport visitors into the final hours of ancient Pompeii is preparing to open near the world-famous archaeological site in southern Italy.
Bob Rogers hands BRC to long-serving leadership team
Experience design company, BRC Imagination Arts, has completed a transition that sees founder Bob Rogers pass ownership of the business to four long-serving senior executives, while remaining actively involved with the company.
Rainer Maelzer joins Therme Group as chief entertainment officer
Rainer Maelzer, an experiential entertainment innovator, has been appointed chief entertainment officer by Therme Group.
Movie Park Germany reveals new Paramount attraction as part of its 30th anniversary celebrations
Movie Park Germany has opened a new Paramount Pictures-themed attraction as part of its 30th anniversary celebrations, using immersive storytelling and adaptive reuse to reinforce the park’s longstanding “Hollywood in Germany” positioning.
Therme Manchester reveals 90:90 strategy – 90 per cent of the UK population within a 90-minute drive of a Therme
Therme Manchester’s 28-acre development, which will include interconnected glass pavilions that measure 65,000sq m, will be the largest bathing and wellbeing attraction in the world once complete, according to prof David Russell, CEO of Therme UK. 
+ More news   
 
COMPANY PROFILES
Painting With Light

By combining lighting, video, scenic and architectural elements, sound and special effects we tell s [more...]
Vekoma Rides Manufacturing B.V.

Vekoma Rides has a large variety of coasters and attractions. [more...]
IDEATTACK

IDEATTACK is a full-service planning and design company with headquarters in Los Angeles. [more...]
Sally Corporation

Our services include: Dark ride design & build; Redevelopment of existing attractions; High-quality [more...]
+ More profiles  
FEATURED SUPPLIER

Iconic Liverpool attraction opens door to new operators
An opportunity to reimagine one of the UK’s most recognisable towers has been formally opened by Rivington Hark, as St Johns Beacon invites operators and partners to shape its next phase. [more...]
CATALOGUE GALLERY
+ More catalogues  
DIRECTORY
+ More directory  
DIARY

 

23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
29 Sep - 02 Oct 2026

Synergy - The Retreat Show

Pical Resort, Valamar Collection, Porec, Croatia
+ More diary  
 


ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
ATTRACTIONS MANAGEMENT NEWS
ATTRACTIONS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS