Latest
issue
Get Attractions Management digital magazine FREE
Sign up here ▸
Jobs   News   Features   Products   Company profilesProfiles   Magazine   Handbook   Advertise    Subscribe  
NEWS
South Korean studio net contract to design Qatar World Cup stadium
POSTED 27 Apr 2017 . BY Kim Megson
The Fifth Precinct Stadium stadium is being built in Doha’s Al Thumama district Credit: Marc Desbordes
South Korean architecture studio Heerim Architects and Planners are reportedly in line to design Qatar’s 40,000-capacity Fifth Precinct Stadium, which will host matches up to the quarter-final stage at the 2022 FIFA World Cup.

According to Reuters, the practice said in a stock exchange statement on Tuesday (25 April) that it has agreed a US$16.2m (€14.8m, £12.6m) design and engineering services contract for the project.

A joint venture of Qatar’s AlJaber Engineering (JEC) and Turkish construction firm Tekfen Construction was appointed to manage the project by Qatar’s Supreme Committee for Delivery & Legacy in February. It has contracted Heerim, who will work alongside local design firm the Arab Engineering Bureau.

The Korean architects have previously designed the Baku Olympic Stadium, the Incheon 2014 Asian Games Main Stadium, the Pyeongchang 2018 Winter Olympic Gangneung Ice Arena and the forthcoming Uzbekistan Tashkent Multifunctional Ice Rink Complex.

The US$342.5m (€314.4m, £266.8m) Fifth Precinct Stadium stadium is being built in Doha’s Al Thumama district. It is scheduled for completion by 2020.

After the World Cup has ended, temporary seating will be removed to create a reduced capacity of 20,000, making the ground more sustainable as part of Qatar’s modular stadium legacy plans. The development will remain an important sporting hub, with four outdoor training pitches and the offices of the football association’s technical committee located alongside the stadium.

Other World Cup stadiums in the main construction stage include the Al Rayyan Stadium, the Qatar Foundation Stadium, the Lusail Stadium, the Al Bayt Stadium, the Al Wakrah Stadium and the Khalifa International Stadium.

The latter is nearing completion, with the 7,800sq m (83,900sq ft) pitch installed earlier this month in a “world record” time of 13 and a half hours by a team of 40 specialists on site.

In January, Qatar’s finance minister revealed the emirate is spending as much as US$500m (€459m, £389.5m) a week on infrastructure ahead of the World Cup.

A main contractor will be appointed in the second quarter of 2017 to build the tournament's final announced venue, the Ras Abu Aboud Stadium designed by Populous.


RELATED STORIES
  Stadium seats made from palm tree waste proposed for Qatar World Cup innovation challenge


A team of engineers in Saudi Arabia has proposed how stadium seats in the near future could be made more sustainably using the fibres of palm trees.
  Construction team appointed to build Qatar's seventh World Cup stadium


The organisation responsible for delivering the stadiums and infrastructure for the 2022 FIFA World Cup in Qatar has appointed the main contractor to build the 40,000-capacity Al Thumama ground.
  Qatar reveals US$500m per week spending for 2022 World Cup infrastructure


The government of Qatar is spending as much as US$500m (€467m, £399m) a week on infrastructure ahead of the 2022 FIFA World Cup, according to the emirate’s finance minister.
  Qatar World Cup stadium reaches construction milestone


The construction of Qatar’s Al Rayyan Stadium, a proposed host venue of the 2022 FIFA World Cup, has entered a new phase after the first concrete was poured at the location of the stadium’s West Stand.
MORE NEWS
Butterfly sanctuary to host hot yoga during retreat at Jersey Zoo for Hotel de France
Hotel de France, located on the British Isle of Jersey, has created a wellness retreat package that includes a hot yoga session that will take place in Jersey Zoo’s butterfly sanctuary.
Warner Bros Discovery collaborates on upcoming Pompeii attraction
A new immersive attraction designed to transport visitors into the final hours of ancient Pompeii is preparing to open near the world-famous archaeological site in southern Italy.
Bob Rogers hands BRC to long-serving leadership team
Experience design company, BRC Imagination Arts, has completed a transition that sees founder Bob Rogers pass ownership of the business to four long-serving senior executives, while remaining actively involved with the company.
Rainer Maelzer joins Therme Group as chief entertainment officer
Rainer Maelzer, an experiential entertainment innovator, has been appointed chief entertainment officer by Therme Group.
+ More news   

COMPANY PROFILES
TechnoAlpin Indoor

TechnoAlpin is the world leader for snowmaking systems. With the Indoor snow division, TechnoAlpin c [more...]
Vekoma Rides Manufacturing B.V.

Vekoma Rides has a large variety of coasters and attractions. [more...]
Clip 'n Climb

Clip ‘n Climb currently offers facility owners and investors more than 40 colourful and unique Cha [more...]
iPlayCO

iPlayCo was established in 1999. [more...]
+ More profiles  
FEATURED SUPPLIER

Iconic Liverpool attraction opens door to new operators
An opportunity to reimagine one of the UK’s most recognisable towers has been formally opened by Rivington Hark, as St Johns Beacon invites operators and partners to shape its next phase. [more...]
CATALOGUE GALLERY
 

+ More catalogues  
DIRECTORY
+ More directory  
DIARY

 

23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
29 Sep - 02 Oct 2026

Synergy - The Retreat Show

Pical Resort, Valamar Collection, Porec, Croatia
+ More diary  
LATEST ISSUES
+ View Magazine Archive

Attractions Management

2026 issue 1


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2025 issue 2


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2025 issue 1


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2024 issue 4


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management News

06 Apr 2020 issue 153


View on turning pages
Download PDF
View archive
FREE digital subscription
Print subscription

Attractions Handbook

2019


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription
 
ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
 
ATTRACTIONS MANAGEMENT
ATTRACTIONS MANAGEMENT NEWS
ATTRACTIONS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026
Get Attractions Management digital magazine FREE
Sign up here ▸
Jobs    News   Products   Magazine   Subscribe
NEWS
South Korean studio net contract to design Qatar World Cup stadium
POSTED 27 Apr 2017 . BY Kim Megson
The Fifth Precinct Stadium stadium is being built in Doha’s Al Thumama district Credit: Marc Desbordes
South Korean architecture studio Heerim Architects and Planners are reportedly in line to design Qatar’s 40,000-capacity Fifth Precinct Stadium, which will host matches up to the quarter-final stage at the 2022 FIFA World Cup.

According to Reuters, the practice said in a stock exchange statement on Tuesday (25 April) that it has agreed a US$16.2m (€14.8m, £12.6m) design and engineering services contract for the project.

A joint venture of Qatar’s AlJaber Engineering (JEC) and Turkish construction firm Tekfen Construction was appointed to manage the project by Qatar’s Supreme Committee for Delivery & Legacy in February. It has contracted Heerim, who will work alongside local design firm the Arab Engineering Bureau.

The Korean architects have previously designed the Baku Olympic Stadium, the Incheon 2014 Asian Games Main Stadium, the Pyeongchang 2018 Winter Olympic Gangneung Ice Arena and the forthcoming Uzbekistan Tashkent Multifunctional Ice Rink Complex.

The US$342.5m (€314.4m, £266.8m) Fifth Precinct Stadium stadium is being built in Doha’s Al Thumama district. It is scheduled for completion by 2020.

After the World Cup has ended, temporary seating will be removed to create a reduced capacity of 20,000, making the ground more sustainable as part of Qatar’s modular stadium legacy plans. The development will remain an important sporting hub, with four outdoor training pitches and the offices of the football association’s technical committee located alongside the stadium.

Other World Cup stadiums in the main construction stage include the Al Rayyan Stadium, the Qatar Foundation Stadium, the Lusail Stadium, the Al Bayt Stadium, the Al Wakrah Stadium and the Khalifa International Stadium.

The latter is nearing completion, with the 7,800sq m (83,900sq ft) pitch installed earlier this month in a “world record” time of 13 and a half hours by a team of 40 specialists on site.

In January, Qatar’s finance minister revealed the emirate is spending as much as US$500m (€459m, £389.5m) a week on infrastructure ahead of the World Cup.

A main contractor will be appointed in the second quarter of 2017 to build the tournament's final announced venue, the Ras Abu Aboud Stadium designed by Populous.


RELATED STORIES
Stadium seats made from palm tree waste proposed for Qatar World Cup innovation challenge


A team of engineers in Saudi Arabia has proposed how stadium seats in the near future could be made more sustainably using the fibres of palm trees.
Construction team appointed to build Qatar's seventh World Cup stadium


The organisation responsible for delivering the stadiums and infrastructure for the 2022 FIFA World Cup in Qatar has appointed the main contractor to build the 40,000-capacity Al Thumama ground.
Qatar reveals US$500m per week spending for 2022 World Cup infrastructure


The government of Qatar is spending as much as US$500m (€467m, £399m) a week on infrastructure ahead of the 2022 FIFA World Cup, according to the emirate’s finance minister.
Qatar World Cup stadium reaches construction milestone


The construction of Qatar’s Al Rayyan Stadium, a proposed host venue of the 2022 FIFA World Cup, has entered a new phase after the first concrete was poured at the location of the stadium’s West Stand.
MORE NEWS
Butterfly sanctuary to host hot yoga during retreat at Jersey Zoo for Hotel de France
Hotel de France, located on the British Isle of Jersey, has created a wellness retreat package that includes a hot yoga session that will take place in Jersey Zoo’s butterfly sanctuary.
Warner Bros Discovery collaborates on upcoming Pompeii attraction
A new immersive attraction designed to transport visitors into the final hours of ancient Pompeii is preparing to open near the world-famous archaeological site in southern Italy.
Bob Rogers hands BRC to long-serving leadership team
Experience design company, BRC Imagination Arts, has completed a transition that sees founder Bob Rogers pass ownership of the business to four long-serving senior executives, while remaining actively involved with the company.
Rainer Maelzer joins Therme Group as chief entertainment officer
Rainer Maelzer, an experiential entertainment innovator, has been appointed chief entertainment officer by Therme Group.
Movie Park Germany reveals new Paramount attraction as part of its 30th anniversary celebrations
Movie Park Germany has opened a new Paramount Pictures-themed attraction as part of its 30th anniversary celebrations, using immersive storytelling and adaptive reuse to reinforce the park’s longstanding “Hollywood in Germany” positioning.
Therme Manchester reveals 90:90 strategy – 90 per cent of the UK population within a 90-minute drive of a Therme
Therme Manchester’s 28-acre development, which will include interconnected glass pavilions that measure 65,000sq m, will be the largest bathing and wellbeing attraction in the world once complete, according to prof David Russell, CEO of Therme UK. 
+ More news   
 
COMPANY PROFILES
TechnoAlpin Indoor

TechnoAlpin is the world leader for snowmaking systems. With the Indoor snow division, TechnoAlpin c [more...]
Vekoma Rides Manufacturing B.V.

Vekoma Rides has a large variety of coasters and attractions. [more...]
Clip 'n Climb

Clip ‘n Climb currently offers facility owners and investors more than 40 colourful and unique Cha [more...]
iPlayCO

iPlayCo was established in 1999. [more...]
+ More profiles  
FEATURED SUPPLIER

Iconic Liverpool attraction opens door to new operators
An opportunity to reimagine one of the UK’s most recognisable towers has been formally opened by Rivington Hark, as St Johns Beacon invites operators and partners to shape its next phase. [more...]
CATALOGUE GALLERY
+ More catalogues  
DIRECTORY
+ More directory  
DIARY

 

23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
29 Sep - 02 Oct 2026

Synergy - The Retreat Show

Pical Resort, Valamar Collection, Porec, Croatia
+ More diary  
 


ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
ATTRACTIONS MANAGEMENT NEWS
ATTRACTIONS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS