Latest
issue
GET ATTRACTIONS MANAGEMENT
magazine
Yes! Send me the FREE digital edition of Attractions Management and the FREE weekly Attractions Management ezines and breaking news alerts!
Not right now, thanksclose this window I've already subscribed. I've already subscribed.
Get Attractions Management digital magazine FREE
Sign up here ▸
Jobs   News   Features   Products   Company profilesProfiles   Magazine   Handbook   Advertise    Subscribe  
NEWS
Kengo Kuma hits back in Tokyo 2020 stadium row
POSTED 15 Jan 2016 . BY Kim Megson
Kengo Kuma has denied intentional similarities exist between the two designs Credit: Strelka Institute for Media, Architecture and Design
Kengo Kuma has denied intentional similarities exist between the two designs Credit: Strelka Institute for Media, Architecture and Design
The architect developing Japan’s National Stadium for the Tokyo 2020 Olympic Games has publicly refuted claims his studio have copied from an earlier design submitted by Zaha Hadid Architects (ZHA).

According to the Japan Times newspaper, Kengo Kuma spoke at a news conference on 15 January in Tokyo to deny that significant similarities exist between the two designs for the stadium.

“I believe if you take a look at Zaha Hadid’s design and mine, you can see very different impressions of the building,” he is reported to have said.

ZHA – who are embroiled in a row with the Japan Sports Council (JSC) over its decision to drop them from the stadium project – have said that “remarkable similarities” exist between the stadium layout and seating bowl they proposed, and the one created by Kuma.

Yesterday (14 January) ZHA submitted a report to the JSC outlining these claims in detail. In a statement, the firm said the document “will form the basis for the discussions we hope to resume shortly with the JSC to resolve the important issue of the use of valuable design work that is currently the copyright of ZHA and the original design team.”

The studio also said it has received and rejected a written request from the JSC to hand over copyright for the design and sign a non-disclosure agreement in order to receive an overdue payment for its work on the project.

At the press conference, Kuma reportedly said similarities in design are inevitable when trying to create a seating configuration that can give 80,000 spectators a clear view. He added that his stadium is lower and flatter than ZHA’s design and uses different natural materials in a bit to minimise construction costs and integrate the stadium with its surroundings in the leafy Jingu Gaien area.

He also denied suggestions that ZHA were dropped from the project because they are a foreign studio. According to the Japan Times he added that “it is perhaps difficult for architects from other countries to work in Japan” due to the language barrier and the way in which meetings are conducted.

While the ¥149bn (£806m, US$1.2bn, €1.1bn) National Stadium is on course to be completed by November 2019, the row over its development threatens to overshadow the project.
RELATED STORIES
  Zaha Hadid refuses to hand over copyright to Tokyo 2020 stadium design


Zaha Hadid Architects (ZHA) have claimed the Japan Sports Council are withholding payment for the studio’s design for the Japan National Stadium in Tokyo unless the architects give up the copyright to the designs and sign a confidentiality clause.
  Zaha Hadid cries foul as Tokyo 2020 stadium design is chosen


Japanese architects Kengo Kuma have been selected to design the 80,000 capacity stadium which will be the centrepiece of the 2020 Olympics in Tokyo.
  Zaha Hadid Architects question Japanese government's logic for Olympic stadium designs


The architects of the original Tokyo 2020 Olympic stadium have accused the Japanese government of putting the legacy of the Games in jeopardy and overlooking several designers after it unveiled two new plans for the arena.
  Japan Sports Council unveils Olympic Stadium designs


Two stadium designs for the 2020 Tokyo Olympics have been revealed by the Japanese Sports Council.
MORE NEWS
Mubadala makes €1 billion bid for Pierre and Vacances
Abu Dhabi-based investment firm Mubadala Capital has made a binding, fully financed €1 billion offer to acquire Pierre and Vacances SA, the European holiday resort operator behind the continental European Center Parcs business.
Expo 2030 Riyadh will create a permanent global destination
Expo 2030 Riyadh is being planned as a permanent visitor destination, with organisers confirming the six-million-square-metre site will become a Global Village after the event closes.
Australian waterpark acquisition creates new leisure attractions group
The owner of one of Australia's best-known waterparks has acquired a major competitor, creating a new attractions business spanning two of the country's largest visitor destinations.
London Museum reveals 2026 opening date for new Smithfield home
The London Museum’s new site will open in Smithfield, East London, on 28 November 2026.
+ More news   
LATEST JOBS
National Event Planning and Logistics Officer
English Heritage
Salary: £30,190 - £32,636pa + matched pension + benefits
Job location: Home-based with countrywide travel , United Kingdom
+ More jobs  

COMPANY PROFILES
Sally Corporation

Our services include: Dark ride design & build; Redevelopment of existing attractions; High-quality [more...]
Alterface

Alterface’s Creative Division team is seasoned in concept and ride development, as well as storyte [more...]
Clip 'n Climb

Clip ‘n Climb currently offers facility owners and investors more than 40 colourful and unique Cha [more...]
Painting With Light

By combining lighting, video, scenic and architectural elements, sound and special effects we tell s [more...]
+ More profiles  
CATALOGUE GALLERY
 

+ More catalogues  
DIRECTORY
+ More directory  
DIARY

 

23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
29 Sep - 02 Oct 2026

Synergy - The Retreat Show

Pical Resort, Valamar Collection, Porec, Croatia
+ More diary  
LATEST ISSUES
+ View Magazine Archive

Attractions Management

2026 issue 1


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2025 issue 2


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2025 issue 1


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2024 issue 4


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management News

06 Apr 2020 issue 153


View on turning pages
Download PDF
View archive
FREE digital subscription
Print subscription

Attractions Handbook

2019


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription
 
ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
 
ATTRACTIONS MANAGEMENT
ATTRACTIONS MANAGEMENT NEWS
ATTRACTIONS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026
Get Attractions Management digital magazine FREE
Sign up here ▸
Jobs    News   Products   Magazine   Subscribe
NEWS
Kengo Kuma hits back in Tokyo 2020 stadium row
POSTED 15 Jan 2016 . BY Kim Megson
Kengo Kuma has denied intentional similarities exist between the two designs Credit: Strelka Institute for Media, Architecture and Design
Kengo Kuma has denied intentional similarities exist between the two designs Credit: Strelka Institute for Media, Architecture and Design
The architect developing Japan’s National Stadium for the Tokyo 2020 Olympic Games has publicly refuted claims his studio have copied from an earlier design submitted by Zaha Hadid Architects (ZHA).

According to the Japan Times newspaper, Kengo Kuma spoke at a news conference on 15 January in Tokyo to deny that significant similarities exist between the two designs for the stadium.

“I believe if you take a look at Zaha Hadid’s design and mine, you can see very different impressions of the building,” he is reported to have said.

ZHA – who are embroiled in a row with the Japan Sports Council (JSC) over its decision to drop them from the stadium project – have said that “remarkable similarities” exist between the stadium layout and seating bowl they proposed, and the one created by Kuma.

Yesterday (14 January) ZHA submitted a report to the JSC outlining these claims in detail. In a statement, the firm said the document “will form the basis for the discussions we hope to resume shortly with the JSC to resolve the important issue of the use of valuable design work that is currently the copyright of ZHA and the original design team.”

The studio also said it has received and rejected a written request from the JSC to hand over copyright for the design and sign a non-disclosure agreement in order to receive an overdue payment for its work on the project.

At the press conference, Kuma reportedly said similarities in design are inevitable when trying to create a seating configuration that can give 80,000 spectators a clear view. He added that his stadium is lower and flatter than ZHA’s design and uses different natural materials in a bit to minimise construction costs and integrate the stadium with its surroundings in the leafy Jingu Gaien area.

He also denied suggestions that ZHA were dropped from the project because they are a foreign studio. According to the Japan Times he added that “it is perhaps difficult for architects from other countries to work in Japan” due to the language barrier and the way in which meetings are conducted.

While the ¥149bn (£806m, US$1.2bn, €1.1bn) National Stadium is on course to be completed by November 2019, the row over its development threatens to overshadow the project.
RELATED STORIES
Zaha Hadid refuses to hand over copyright to Tokyo 2020 stadium design


Zaha Hadid Architects (ZHA) have claimed the Japan Sports Council are withholding payment for the studio’s design for the Japan National Stadium in Tokyo unless the architects give up the copyright to the designs and sign a confidentiality clause.
Zaha Hadid cries foul as Tokyo 2020 stadium design is chosen


Japanese architects Kengo Kuma have been selected to design the 80,000 capacity stadium which will be the centrepiece of the 2020 Olympics in Tokyo.
Zaha Hadid Architects question Japanese government's logic for Olympic stadium designs


The architects of the original Tokyo 2020 Olympic stadium have accused the Japanese government of putting the legacy of the Games in jeopardy and overlooking several designers after it unveiled two new plans for the arena.
Japan Sports Council unveils Olympic Stadium designs


Two stadium designs for the 2020 Tokyo Olympics have been revealed by the Japanese Sports Council.
MORE NEWS
Mubadala makes €1 billion bid for Pierre and Vacances
Abu Dhabi-based investment firm Mubadala Capital has made a binding, fully financed €1 billion offer to acquire Pierre and Vacances SA, the European holiday resort operator behind the continental European Center Parcs business.
Expo 2030 Riyadh will create a permanent global destination
Expo 2030 Riyadh is being planned as a permanent visitor destination, with organisers confirming the six-million-square-metre site will become a Global Village after the event closes.
Australian waterpark acquisition creates new leisure attractions group
The owner of one of Australia's best-known waterparks has acquired a major competitor, creating a new attractions business spanning two of the country's largest visitor destinations.
London Museum reveals 2026 opening date for new Smithfield home
The London Museum’s new site will open in Smithfield, East London, on 28 November 2026.
Toverland unveils €98m expansion plan as park prepares to launch resort development
The Toverland theme park in the Netherlands has announced a €98m expansion programme that will add a resort, new attractions and staff facilities as it pursues plans to become a multi- day destination.
Butterfly sanctuary to host hot yoga during retreat at Jersey Zoo for Hotel de France
Hotel de France, located on the British Isle of Jersey, has created a wellness retreat package that includes a hot yoga session that will take place in Jersey Zoo’s butterfly sanctuary.
+ More news   
 
COMPANY PROFILES
Sally Corporation

Our services include: Dark ride design & build; Redevelopment of existing attractions; High-quality [more...]
Alterface

Alterface’s Creative Division team is seasoned in concept and ride development, as well as storyte [more...]
Clip 'n Climb

Clip ‘n Climb currently offers facility owners and investors more than 40 colourful and unique Cha [more...]
Painting With Light

By combining lighting, video, scenic and architectural elements, sound and special effects we tell s [more...]
+ More profiles  
CATALOGUE GALLERY
+ More catalogues  
DIRECTORY
+ More directory  
DIARY

 

23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
29 Sep - 02 Oct 2026

Synergy - The Retreat Show

Pical Resort, Valamar Collection, Porec, Croatia
+ More diary  
 


ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
ATTRACTIONS MANAGEMENT NEWS
ATTRACTIONS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS