Latest
issue
Get Attractions Management digital magazine FREE
Sign up here ▸
Jobs   News   Features   Products   Company profilesProfiles   Magazine   Handbook   Advertise    Subscribe  
NEWS
Construction begins on Kengo Kuma's National Stadium for 2020 Tokyo Olympics
POSTED 13 Dec 2016 . BY Kim Megson
Kuma chose a wooden lattice design for the stadium that evokes traditional styles seen in Japanese shrines and pagodas Credit: Taisei Corporation, Azusa Sekkei Co., Ltd. and Kengo Kuma and Associates

The new stadium will realise ‘an athlete first’ policy with the best universal design in the world and some Japanese flavour
– Shinzo Abe, Japan prime minister
Construction work has kicked off on Tokyo’s new National Stadium, the Kengo Kuma-designed stage for the 2020 Olympics and Paralympics.

The design by the Japanese architect was chosen to replace Zaha Hadid Architects’ original scheme – ostensibly due to the rising cost of that project – in December 2015, and received the green light two months ago. Kuma’s stadium is estimated to cost 150bn yen ($1.5bn, €1.3bn, £1.1bn) to build.

Construction company Taisei Corp and building planner Azusa Sekkei Co have been contracted to complete the work, which is being overseen by the Japan Sport Council – organiser of the Games. The project is expected to be finished by the end of November 2019.

Kuma chose a wooden lattice design for the stadium, which evokes traditional styles seen in
Japanese shrines and pagodas and blends in with the surrounding forests through its heavy use of landscaping. The structure will use Japanese-grown larch in its wood as well as steel composite roof and prefabricated panels to minimise costs and ensure a relatively quick construction timeline.

Speaking at the groundbreaking ceremony, Japan’s prime minister, Shinzo Abe, said: “The new image of the stadium will realise ‘an athlete first’ policy with the best universal design in the world and some Japanese flavour. I’m very confident that this can be the stronghold of sports and culture for the new era.

“When we scrapped the original plan last July, I vowed to make the new venue one that will be celebrated by the people and the athletes, a place that can generate dreams and inspiration.”

Recently-elected Tokyo governor Yuriko Koike, who has been a vocal critic of the bloated costs of hosting the Olympics, said that the National Stadium will symbolise “the legacy of the Games and environmental sustainability,” adding, “I hope it will be loved by people for a long time to come.”

Earlier this year Kuma told Sports Management's sister title CLAD that he wants the new stadium, and the 2020 Games more broadly, to symbolise today’s Japan – a country “whose culture and direction is totally opposite to what went before” due to a slowing down of both economic growth and the pace of life.

“This new direction can be called the age of maturity,” he said. “People are finding a new, slower kind of lifestyle. But slowdown is not bad. Slowdown is creating new types of culture, new types of lifestyle. Actually, when you look at Japanese history, it is not a history of expansion. We’re basically very slow and very quiet, and I’m happy to see us go back to that time of quietness.

“For the stadium, I have used a lot of wood because I think it’s an appropriate material to symbolise this change. We once lived together and aged together with wood. I want to go back to that kind of natural circulation with my work.”
Construction on the stadium has now begun in Tokyo's Shinjuku Ward Credit: Kyodo News via AP
Government and city officials, and architect Kengo Kuma (far left), turn on the switch during a groundbreaking ceremony Credit: AP/Press Association Images
The design also uses landscaping to blend in with the surrounding trees Credit: Taisei Corporation, Azusa Sekkei Co., Ltd. and Kengo Kuma and Associates
The stadium is expected to be finished by November 2019 Credit: Taisei Corporation, Azusa Sekkei Co., Ltd. and Kengo Kuma and Associates
Japanese prime minister Shinzo Abe said: 'I’m very confident that this stadium can be the stronghold of sports and culture for the new era' Credit: AP Photo/Shizuo Kambayashi
RELATED STORIES
  FEATURE: Interview: Kengo Kuma


The Tokyo Olympic Stadium designer shares his philosophies
  Defiant Kuma's Tokyo Olympic Stadium granted green light


The Japanese government has approved a 150bn yen ($1.5bn) contract allowing work to begin on Kengo Kuma’s 2020 Tokyo Olympic Stadium.
  Maki and Kuma campaign for Tokyo gymnasium to receive UNESCO recognition


A group of Japanese architects, including Fumihiko Maki and Kengo Kuma, are petitioning UNESCO to recognise the gymnasium building designed by Kenzo Tange for the 1964 Tokyo Olympics on its World Cultural Heritage list.
MORE NEWS
Expo 2030 Riyadh will create a permanent global destination
Expo 2030 Riyadh is being planned as a permanent visitor destination, with organisers confirming the six-million-square-metre site will become a Global Village after the event closes.
Australian waterpark acquisition creates new leisure attractions group
The owner of one of Australia's best-known waterparks has acquired a major competitor, creating a new attractions business spanning two of the country's largest visitor destinations.
London Museum reveals 2026 opening date for new Smithfield home
The London Museum’s new site will open in Smithfield, East London, on 28 November 2026.
Toverland unveils €98m expansion plan as park prepares to launch resort development
The Toverland theme park in the Netherlands has announced a €98m expansion programme that will add a resort, new attractions and staff facilities as it pursues plans to become a multi- day destination.
+ More news   
LATEST JOBS
National Event Planning and Logistics Officer
English Heritage
Salary: £30,190 - £32,636pa + matched pension + benefits
Job location: Home-based with countrywide travel , United Kingdom
+ More jobs  

COMPANY PROFILES
Simworx Ltd

The company was initially established in 1997. Terry Monkton and Andrew Roberts are the key stakeh [more...]
Painting With Light

By combining lighting, video, scenic and architectural elements, sound and special effects we tell s [more...]
Holovis

Holovis is a privately owned company established in 2004 by CEO Stuart Hetherington. [more...]
Alterface

Alterface’s Creative Division team is seasoned in concept and ride development, as well as storyte [more...]
+ More profiles  
CATALOGUE GALLERY
 

+ More catalogues  
DIRECTORY
+ More directory  
DIARY

 

23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
29 Sep - 02 Oct 2026

Synergy - The Retreat Show

Pical Resort, Valamar Collection, Porec, Croatia
+ More diary  
LATEST ISSUES
+ View Magazine Archive

Attractions Management

2026 issue 1


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2025 issue 2


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2025 issue 1


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management

2024 issue 4


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription

Attractions Management News

06 Apr 2020 issue 153


View on turning pages
Download PDF
View archive
FREE digital subscription
Print subscription

Attractions Handbook

2019


View issue contents
View on turning pages
Download PDF
FREE digital subscription
Print subscription
 
ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
 
ATTRACTIONS MANAGEMENT
ATTRACTIONS MANAGEMENT NEWS
ATTRACTIONS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026
Get Attractions Management digital magazine FREE
Sign up here ▸
Jobs    News   Products   Magazine   Subscribe
NEWS
Construction begins on Kengo Kuma's National Stadium for 2020 Tokyo Olympics
POSTED 13 Dec 2016 . BY Kim Megson
Kuma chose a wooden lattice design for the stadium that evokes traditional styles seen in Japanese shrines and pagodas Credit: Taisei Corporation, Azusa Sekkei Co., Ltd. and Kengo Kuma and Associates
The new stadium will realise ‘an athlete first’ policy with the best universal design in the world and some Japanese flavour
– Shinzo Abe, Japan prime minister
Construction work has kicked off on Tokyo’s new National Stadium, the Kengo Kuma-designed stage for the 2020 Olympics and Paralympics.

The design by the Japanese architect was chosen to replace Zaha Hadid Architects’ original scheme – ostensibly due to the rising cost of that project – in December 2015, and received the green light two months ago. Kuma’s stadium is estimated to cost 150bn yen ($1.5bn, €1.3bn, £1.1bn) to build.

Construction company Taisei Corp and building planner Azusa Sekkei Co have been contracted to complete the work, which is being overseen by the Japan Sport Council – organiser of the Games. The project is expected to be finished by the end of November 2019.

Kuma chose a wooden lattice design for the stadium, which evokes traditional styles seen in
Japanese shrines and pagodas and blends in with the surrounding forests through its heavy use of landscaping. The structure will use Japanese-grown larch in its wood as well as steel composite roof and prefabricated panels to minimise costs and ensure a relatively quick construction timeline.

Speaking at the groundbreaking ceremony, Japan’s prime minister, Shinzo Abe, said: “The new image of the stadium will realise ‘an athlete first’ policy with the best universal design in the world and some Japanese flavour. I’m very confident that this can be the stronghold of sports and culture for the new era.

“When we scrapped the original plan last July, I vowed to make the new venue one that will be celebrated by the people and the athletes, a place that can generate dreams and inspiration.”

Recently-elected Tokyo governor Yuriko Koike, who has been a vocal critic of the bloated costs of hosting the Olympics, said that the National Stadium will symbolise “the legacy of the Games and environmental sustainability,” adding, “I hope it will be loved by people for a long time to come.”

Earlier this year Kuma told Sports Management's sister title CLAD that he wants the new stadium, and the 2020 Games more broadly, to symbolise today’s Japan – a country “whose culture and direction is totally opposite to what went before” due to a slowing down of both economic growth and the pace of life.

“This new direction can be called the age of maturity,” he said. “People are finding a new, slower kind of lifestyle. But slowdown is not bad. Slowdown is creating new types of culture, new types of lifestyle. Actually, when you look at Japanese history, it is not a history of expansion. We’re basically very slow and very quiet, and I’m happy to see us go back to that time of quietness.

“For the stadium, I have used a lot of wood because I think it’s an appropriate material to symbolise this change. We once lived together and aged together with wood. I want to go back to that kind of natural circulation with my work.”
Construction on the stadium has now begun in Tokyo's Shinjuku Ward Credit: Kyodo News via AP
Government and city officials, and architect Kengo Kuma (far left), turn on the switch during a groundbreaking ceremony Credit: AP/Press Association Images
The design also uses landscaping to blend in with the surrounding trees Credit: Taisei Corporation, Azusa Sekkei Co., Ltd. and Kengo Kuma and Associates
The stadium is expected to be finished by November 2019 Credit: Taisei Corporation, Azusa Sekkei Co., Ltd. and Kengo Kuma and Associates
Japanese prime minister Shinzo Abe said: 'I’m very confident that this stadium can be the stronghold of sports and culture for the new era' Credit: AP Photo/Shizuo Kambayashi
RELATED STORIES
FEATURE: Interview: Kengo Kuma


The Tokyo Olympic Stadium designer shares his philosophies
Defiant Kuma's Tokyo Olympic Stadium granted green light


The Japanese government has approved a 150bn yen ($1.5bn) contract allowing work to begin on Kengo Kuma’s 2020 Tokyo Olympic Stadium.
Maki and Kuma campaign for Tokyo gymnasium to receive UNESCO recognition


A group of Japanese architects, including Fumihiko Maki and Kengo Kuma, are petitioning UNESCO to recognise the gymnasium building designed by Kenzo Tange for the 1964 Tokyo Olympics on its World Cultural Heritage list.
MORE NEWS
Expo 2030 Riyadh will create a permanent global destination
Expo 2030 Riyadh is being planned as a permanent visitor destination, with organisers confirming the six-million-square-metre site will become a Global Village after the event closes.
Australian waterpark acquisition creates new leisure attractions group
The owner of one of Australia's best-known waterparks has acquired a major competitor, creating a new attractions business spanning two of the country's largest visitor destinations.
London Museum reveals 2026 opening date for new Smithfield home
The London Museum’s new site will open in Smithfield, East London, on 28 November 2026.
Toverland unveils €98m expansion plan as park prepares to launch resort development
The Toverland theme park in the Netherlands has announced a €98m expansion programme that will add a resort, new attractions and staff facilities as it pursues plans to become a multi- day destination.
Butterfly sanctuary to host hot yoga during retreat at Jersey Zoo for Hotel de France
Hotel de France, located on the British Isle of Jersey, has created a wellness retreat package that includes a hot yoga session that will take place in Jersey Zoo’s butterfly sanctuary.
Warner Bros Discovery collaborates on upcoming Pompeii attraction
A new immersive attraction designed to transport visitors into the final hours of ancient Pompeii is preparing to open near the world-famous archaeological site in southern Italy.
+ More news   
 
COMPANY PROFILES
Simworx Ltd

The company was initially established in 1997. Terry Monkton and Andrew Roberts are the key stakeh [more...]
Painting With Light

By combining lighting, video, scenic and architectural elements, sound and special effects we tell s [more...]
Holovis

Holovis is a privately owned company established in 2004 by CEO Stuart Hetherington. [more...]
Alterface

Alterface’s Creative Division team is seasoned in concept and ride development, as well as storyte [more...]
+ More profiles  
CATALOGUE GALLERY
+ More catalogues  
DIRECTORY
+ More directory  
DIARY

 

23-26 Aug 2026

Elevate Spa Riviera Maya Edition

The Riviera Maya Edition Kanai, Playa del Carmen, Mexico
29 Sep - 02 Oct 2026

Synergy - The Retreat Show

Pical Resort, Valamar Collection, Porec, Croatia
+ More diary  
 


ADVERTISE . CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
ATTRACTIONS MANAGEMENT NEWS
ATTRACTIONS HANDBOOK
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS